Avoid the unexpected with our pre-excavation injection technologies
Unexpected water ingress and poor ground conditions can cause significant delays and escalate costs in tunnel development.
Handle challenging situations with our post-excavation injection technologies
- Low to high volume water ingress demonstrate a wider risk for every underground operation.
- Changing geology may lead to instable ground conditions.
- Existing underground structures may need rehabilitation.
To counteract these risks and challenges, we offer a comprehensive range of injection solutions and technical support.
Cementitious grouting systems:Microcements for water management and consolidation in pre-excavation grouting applications into fine cracks where fast setting and high strength is needed.
Mineral Grouts:Colloidal Silica for water management and consolidation in pre-excavation grouting applications into finest fissures.
Polyurethanes & Polyurea silicates: Foaming, water sensitive 1K & 2K polyurethanes to quickly combat water ingress. Fast-reacting, non-water-sensitive, compact and foaming polyurea silicate systems to stabilize poor ground and filling of bigger voids.
Acrylates: Flexible hydrogel acrylic resins for rehabilitation injections in all types of concrete structures.
More information in our
Any questions concerning our product portfolio and services?
Injection workshops
- Hands-on exercise and training at Hagerbach test gallery in October 2019
- Customized training available for individual projects worldwide
Want to find out more?
Write to us: